Todd Field Repairs Finally Approved by MNDOT

Repairs to the damage done to the wall at Todd Field when it was struck by a vehicle back in March are finally being addressed. After much jurisdictional wrangling and sifting of red tape by MNDOT, the Hastings School District has been given the go-ahead to start repairs. ISD 200 Superintendent Tim Collins explains.

Click here for audio

   
   

Permanent link to this article: https://kdwa.com/2015/05/todd-field-repairs-finally-approved-by-mndot/