The majority of Riverfront Renaissance Phase 2 construction is now being done in Levee Park. Hastings Public Works Director Nick Egger talks about one of the park’s special features.
The majority of Riverfront Renaissance Phase 2 construction is now being done in Levee Park. Hastings Public Works Director Nick Egger talks about one of the park’s special features.
Permanent link to this article: https://kdwa.com/2015/07/rrp2-work-mostly-at-levee-park/